Hospital - North England
  Before.
     
  After.
     
Products Used    
Renotex Renoprep
 

The hospital maintenance engineer approached us with the problems of cracked render and penetrating damp on the building, which was erected in 1947 on a temporary basis. The cost of rebuilding it was prohibitive and so renovation was carried out. Renotex coating was applied on to a newly rendered Renoprep application, thus improving the standard of insulation and waterproofing. This contract was carried out by our own contracting division.

 
Close this Window